(+971) 800 action

Dewatering, Groundwater, Drainage, Hyrdogeology, Water, Treatment, Remediation, Industrial, HDPE, Pipeline, Pigging, Jetting, Flushing, Filtration, Overpumping, Bundle, Pump, Temporary, Power, Generator, Air, Compressor, Tower Light, UAE, Dubai, Abu Dhabi, KSA, Jeddah, Dammam, Riyadh, Qatar, Doha, Bahrain, Manama
![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
---|
Fluid Storage
No matter what fluid you wish to store, ACTION has the solution. All Tanks are either in-stock, or built-to-order on-premises, by our specialist fabrication teams to meet local and international standards.
Many government authorities and environment agencies now insist on settlement tanks being used for certain applications. Our settlement tanks are available in a variety of sizes and are specially designed to remove suspended solids, and prevent silt and fines being discharged into the water course or drains. By utilising our settlement tanks, full pumping capacity can be maintained and problems can be avoided.
ACTION's site water storage solutions are designed and manufactured to the highest standards, and are fully compliant with current Health & Safety legislation, which requires all construction sites to provide washing facilities, alongside use for mixing cements/concrete, washing, cooling, hydro, demolition, and concrete saws, etc.
We also hold stocks of high volume storage tanks for larger projects such as piling, river diversions and over pumping etc. 6m, 12m, and 24m Break Tanks are either readily available for hire, or built to order, for sale. They can be fitted with various size filter screens to suit individual requirements.
Bunded Fuel Bowsers
As an auxiliary fuel tank this product provides longer engine running time, reducing the number of site visits required for refuelling. Also, they reduce machinery and equipment downtime, with your own on-site fuelling station. Can also act as a multi-task tank, with multiple feed / return lines (e.g. generators). Can be easily and safely handled full or part full of fuel by crane or forklift. Stackable 2-high full, or 3-high empty to reduce footprint requirements in storage or on location.With UN Approval there is no need to empty the tank before transportation away from site.